Skip to main content
Image of the Baltimore County Seal

Main navigation

  • Services
  • Report
  • Pay
  • Apply
  • Contact
Baltimore County Government
Use the dropdown menu to select your preferred language
English العربية Français 한국어 Русский Español

Breadcrumb

  1. Home
  2. Departments
  3. Permits, Approvals and Inspections
  4. Development Plans Review

Development Plans Review

RESPONSIBILITIES

The Development Plans Review (DPR) Bureau's primary functions include:

  • Reviewing zoning special exceptions, variances and special hearing requests for Public Works issues; as well as BGE, Verizon and other private utility permits for development-related issues
  • Attending concept and development plan conferences, as well as administrative hearings
  • Reviewing and approving landscape and photometric plans, as well as development plans on behalf of the Department of Recreation and Parks for Local Open Space issues
  • Reviewing and approving all development plans, minor subdivisions, infill lots, construction drawings and building permits for compliance with the following:
    • Engineering requirements regarding access, water supply, wastewater removal and storm drainage
    • Baltimore County Code
    • Development Management and Plan Review Policy Manual
    • Design Manual
    • Standard Details
    • Landscape Manual
    • Residential Open Space Manual
    • Community Banner Permits

CHECKLISTS AND FORMS

DPR may require these forms and checklists for submittal with certain applications.

  • Grading Plan Review Checklist
  • SHA Sight Distance Chart
  • Roads and Streets
  • Storm Drains 95 Percent
  • Water
  • Sewer
  • 100-year Floodplain Study Report
  • Floodplain Checklist for DPWT
  • Noise Study
  • Record Plat Checklist
  • Baltimore County Schematic Landscape Plan Checklist
  • Baltimore County Final Landscape Plan Checklist
  • Residential Water and Sewer Connection Process
  • Commercial Water and Sewer Connection Process 

residential open space manual

View this document for certification that the residential open space requirements have been fulfilled as set forth on the approved development plan or specified by the Baltimore County Residential Open Space Manual.

INDEPENDENT DEVELOPER'S PLAN REVIEW PROGRAM

A new independent developer’s plan review program is available to expedite the developer’s plan review process including the following: 

  • Program Policy
  • Reviewer Requirements
  • Review Process
  • Acknowledgement and Indemnification Agreement

Contact Us

Development Plans Review

County Office Building
111 West Chesapeake Avenue
Room 119
Towson, Maryland 21204

Hours

Monday through Friday
8:30 a.m. to 4:30 p.m.

Email

paidevrvw@baltimorecountymd.gov

Phone

410-887-3751

Fax

410-887-4423

BALTCOGO311

Report a problem
Image of the Baltimore County Seal
Baltimore County Government
400 Washington Avenue, Towson Maryland 21204(link is external)
BaltCoGo 311 Logo
Download now on:
  •   App Store (link is external)
  •   Google Play (link is external)

Find Information

  • Find a County Service
  • Phone Numbers
  • Report a Problem
  • Directions (link is external)

Policies

  • User Terms
  • Privacy
  • Reasonable Accommodation

Connect With Us

(link is external) (link is external) (link is external)

Translate

English العربية Français 한국어 Русский Español
© Copyright 2025 Baltimore County Government
Back to top